801 resultados para Processo de projeto


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Perhaps one problem is that with the advent of BIM we are moving from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behavior related issues despite the advent of new technologies. The fragmented and dispersed nature of the AEC sector and the huge number of small organizations that comprise it would probably be a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Muitas perdas que ocorrem na construção civil originam-se forados canteiros de obras,nas etapas que antecedem a produção, principalmente devido a problemas de caráter gerencial, relacionados à falta de integração entre os principais intervenientes. Neste contexto,a aplicação dos conceitos da gestão da cadeia de suprimentos tem sido estudada como uma possível alternativa para a solução de problemas e introdução de melhorias no setor. A cadeia de elevadores, cujo produto final representa um percentual elevado nos custos de edifícios altos, apresenta problemas que são pouco conhecidos e explorados. Este desconhecimento pode estar escondendo um potencial de desenvolvimento e melhoria do processo de produção de elevadores como um todo.O presente trabalho consiste em propor diretrizes para a melhoria dos processos de projeto,aquisição e instalação de elevadores, tendo como base os conceitos de gestão da cadeia de suprimentos. O método de pesquisa foi dividido em três etapas.Inicialmente, foi realizada uma caracterização inicial dos processos e problemas existentes no setor,compreendendo uma revisão bibliográfica e a aplicação de entrevistas com arquitetos ,engenheiros e especialistas em construção civil. Na segunda etapa foi realizado um estudo de caso do relacionamento dos agentes da cadeia no município de Porto Alegre, de forma a realizar um diagnóstico dos fluxos de materiais e informações entre os mesmos.Com este propósito,foram realizadas entrevistas com fabricantes e montadores de elevadores,visitas aos canteiros de obras,uma análise de documentos e um levantamento de percepções de uma amostra de usuários finais de elevadores.Finalmente, são propostas as diretrizes para a melhoria dos processos estudados Entre as principais conclusões deste estudo, observou-se a falta de visão sistêmica por parte dos agentes da cadeia estudada. Além disso,constatou-se problemas relacionados às práticas de cooperação,à falta de integração e coordenação dos fluxos de materiais e informações entre os agentes,indicando uma oportunidade para a aplicação de conceitos da gestão da cadeia de suprimentos na melhoria dos processos estudados.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O projeto de edificações é um dos processos mais importantes em empreendimentos de construção pelo seu impacto em termos de custo e qualidade do produto final. Entretanto, observam-se muitos problemas relacionados ao gerenciamento inadequado do mesmo, tais como ineficiente comunicação entre os intervenientes, indefinição de responsabilidades e ocorrência de erros em projetos. Muitos destes problemas dizem respeito à sub utilização dos sistemas CAD e tecnologias da informação. O presente trabalho tem como objetivo propor diretrizes e padrões para gestão do fluxo de informações e para produção de desenhos no processo de projeto utilizando recursos computacionais. Busca-se, assim, o aumento da eficiência do uso dos sistemas CAD e tecnologias da informação e também uma maior eficiência nas trocas de informações entre os intervenientes. Para tal, foram realizados dois estudos de caso em empresas construtoras incorporadoras de pequeno porte situadas na Região Metropolitana de Porto Alegre - RS. A partir dos estudos de caso, foram desenvolvidos os seguintes padrões: estrutura de diretórios, back up de arquivos de desenho, nomenclatura de arquivos de desenho, protocolos de envio e recebimento de arquivos ou plantas, controle de versões de plantas ou memoriais descritivos enviados à obra, nomenclatura de layers, layers para integração, diretrizes para produção de desenhos no computador e diretrizes para apresentação de plantas. Além disso, foram identificadas e discutidas novas tendências em termos de aplicação das tecnologias da informação no processo de projeto. No entanto, salienta-se que este trabalho não tem a intenção de quebrar o paradigma atual do processo de projeto, mas sim, contribuir para preparar as empresas construtoras incorporadoras e escritórios de projeto para as tendências futuras de informatização.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A necessidade de redução dos custos e prazos no processo construtivo tem incentivado as empresas construtoras do subsetor edificações a direcionarem seus esforços para o processo de gestão de projetos. Esta etapa do processo construtivo é notoriamente estratégica para as etapas subseqüentes, uma vez que tem potencial de interferência bastante significativo com custo praticamente irrisório frente aos valores totais do empreendimento. Porém, o aumento da complexidade dos empreendimentos, levando ao surgimento de novas especialidades de projeto e, também, de novas funções dentro desse processo, têm promovido a reestruturação das empresas construtoras e de seus contratados. A coordenação de projetos é uma dessas funções recentemente implantadas com objetivos direcionados para as diversas fases do processo: participante ativo da definição do empreendimento; responsável pela inserção dos requisitos dos projetos desde sua concepção, reduzindo as restrições dos projetos e integrando as soluções finais; como elo de ligação entre a equipe de projeto e a equipe de produção. Sendo uma função recente no processo gestão de projetos, os procedimentos de trabalho junto aos demais intervenientes ainda são pouco compreendidos A ligação estreita entre coordenadores e projetistas ao longo do desenvolvimento dos projetos origina dificuldades que são frutos dos conflitos de interesse entre as partes, sendo necessário uma análise dessas dificuldades sob o ponto de vista da interferência que causa na coordenação de projetos. Desta forma, este trabalho tem por objetivo a caracterização das funções e atividades dos coordenadores de projetos nas empresas construtoras de Porto Alegre/RS. Para isso, foram realizados dois levantamentos com projetistas e com coordenadores de projeto através de entrevistas parcialmente estruturadas. As entrevistas com os projetistas forneceram questões conflitantes que foram discutidas com os coordenadores de projetos. Neste segundo levantamento foram, também, questionadas as atividades desempenhadas pela coordenação ao longo do processo de projeto. Desta forma, foi possível analisar o nível de desenvolvimento das funções e atividades desempenhadas pelos coordenadores de projetos entre as empresas construtoras de Porto Alegre/RS pesquisadas.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines, through case studies, the organization of the production process of architectural projects in architecture offices in the city of Natal, specifically in relation to building projects. The specifics of the design process in architecture, the production of the project in a professional field in Natal, are studied in light of theories of design and its production process. The survey, in its different phases, was conducted between March 2010 and September 2012 and aimed to identify, understand, and analyze comparatively, by mapping the design process, the organization of production of building projects in two offices in Natal, checking as well the relationships of their agents during the process. The project was based on desk research and exploration, adopting, for both, data collection tools such as forms, questionnaires, and interviews. With the specific aim of mapping the design process, we adopted a technique that allows obtaining the information directly from employee agents involved in the production process. The technique consisted of registering information by completing daily, during or at the end of the workday, an individual virtual agenda, in which all agent collaborators described the tasks performed. The data collected allowed for the identification of the organizational structure of the office, its hierarchy, the responsibilities of agents, as well as the tasks performed by them during the two months of monitoring at each office. The research findings were based on analyses of data collected in the two offices and on comparative studies between the results of these analyses. The end result was a diagnostic evaluation that considered the level of organization and elaborated this perspective, as well as proposed solutions aimed at improving both the organization of the process and the relationships between the agents under the lens analyzed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O presente trabalho procurou identificar as competências necessárias, no processo de formação profissional do Arquiteto e urbanista, durante a graduação, tendo como foco a sua atuação como coordenador do processo de Projeto de edificações. A pesquisa utilizou uma metodologia qualitativa com enfoque exploratório e descritivo, envolvendo coleta de dados através de pesquisa de opinião. Foram analisados dados como: Resoluções do MEC e CONFEA/CREA, grades curriculares das Faculdades de Arquitetura e Urbanismo da Região Metropolitana de Belém-PA e a percepção de alunos e arquitetos (docentes e profissionais liberais) através de entrevistas, tendo como principal resultado uma proposta de reformulação curricular na formação do arquiteto e urbanista, através da inclusão de conhecimentos sobre coordenação do processo de projeto de edificações, com o objetivo de atender as necessidades deste profissional no campo de trabalho. O principal resultado obtido, foi uma proposta para o desenvolvimento de competências que procura trabalhar através de conhecimentos, habilidades e atitudes relacionados aos conteúdos, experiências de aprendizagem e formas de avaliação, a melhor forma de contribuir de forma efetiva com a formação do arquiteto e urbanista, com o objetivo possibilitar que este profissional possa atuar como coordenador do processo de projeto de edificações.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O trabalho trata do fluxo de informações no processo de desenvolvimento de projetos, de edificações comerciais e multifamiliares verticais, gerados a partir das rotinas de comunicação entre empresa construtora, arquiteto, projetistas de estrutura, de instalações elétricas e hidrosanitárias e os procedimentos por eles aplicados, para se alcançar a qualidade desejada dos projetos. São investigados a problemática das metodologias tradicionais de projeto e a aplicabilidade de conceitos de engenharia simultânea, sugerindo a realização em paralelo das varias etapas do processo, desenvolvimento integrado de projetos do produto e da produção, estabelecimento de equipes ultidisciplinares e uma maior orientação para a satisfação do cliente final. É apresentado um método de análise capaz de identificar a maturidade das empresas construtoras para a implantação da engenharia simultânea e a explicitação do fluxo de informações, fornecendo uma visão global do processo de projeto. São realizados três estudos de caso consultando três empresas construtoras e incorporadoras e seus respectivos projetistas: arquiteto, engenheiro estrutural, elétrico e hidrosanitário, os quais corroboram as hipóteses estabelecidas na pesquisa. Como conclusão recomenda-se o desenvolvimento de modelos de processo de projeto baseados nos princípios de engenharia simultânea e métodos que possam vir a oferecer uma visão global do processo, dando suporte aos intervenientes na troca sistematizada e racionalizada das informações, objetivando a introdução de ferramentas que possam contribuir para uma modelagem do processo de projeto harmonizada com os princípios de qualidade.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

O artigo apresenta uma reflexão sobre a gestão do processo de projeto paramétrico, com superfícies complexas, baseado em duas experiências realizadas no Instituto de Arquitetura e Urbanismo, da USP de São Carlos, pelo grupo de pesquisa Nomads.usp. SLICE é o resultado parcial de um pavilhão temporário, com superfícies complexas, desenvolvido por meio de projeto paramétrico e técnicas de fabricação digital. Utilizou-se o procedimento de uma pesquisa-ação2 com alunos de graduação e recém-formados em arquitetura, arquitetos do Nomads.usp e a indústria. Os experimentos apontaram para reflexões sobre algumas mudanças na gestão destes processos, para facilitar a viabilidade técnico-construtiva e gerar conhecimento nas áreas de projeto paramétrico, fabricação digital e gestão. O artigo tem caráter exploratório e o desafio é entender e avaliar a gestão do projeto paramétrico em relação a restrição de material, custo de execução e tempo de produção.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Edição especial sobre a reforma do Código de processo penal, organizado por Fabiano Augusto Martins Silveira.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nos últimos anos, a discussão sobre a implementação do conceito de modelagem da informação da construção tem permanecido nas pautas das empresas do setor da construção civil em todo o mundo; no entanto, no cenário brasileiro, o descompasso entre a estratégia setorial e as iniciativas individuais de algumas empresas tem chamado a atenção. Partindo do princípio de que o conceito de modelagem da informação da construção, em função do seu caráter de inovação tecnológica, carrega consigo a necessidade de mudanças, a reflexão e adaptações sobre os diversos processos que permeiam a produção dos empreendimentos de construção torna-se fundamental. Nesse contexto, o objetivo desta tese é propor um conjunto de Diretrizes para Gestão do Processo de Projeto em Empresas Incorporadoras e Construtoras. As Diretrizes estão pautadas na necessidade de definir o projeto como um processo estratégico, inserindo a sua gestão como elemento fundamental para a facilitação e integração do fluxo de informações no âmbito do empreendimento. Para a concretização do objetivo da tese, realizaram-se Estudos de Caso em empresas Incorporadoras e Construtoras brasileiras com o objetivo de diagnosticar as práticas vigentes de gestão do processo de projeto. Em paralelo, conduziu-se a reflexão sobre as responsabilidades do gestor do processo de projeto no âmbito da modelagem por meio de Grupos de Foco envolvendo gestores do processo de projeto e especialistas em tecnologia da informação aplicada à construção. Além disso, a metodologia de pesquisa contempla um Estudo de Caso com foco para a implementação do Conceito de Modelagem da Informação no contexto setorial do Reino Unido. Como resultado das Diretrizes, apresenta-se o Modelo para Gestão do Processo de Projeto no Contexto da Modelagem, seguido pelo Plano de Reestruração para o Departamento de Projetos, o qual visa à proposição de um modelo estruturado para condução das mudanças necessárias nas áreas responsáveis pelo processo de projeto das empresas Incorporadoras e Construtoras.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

No presente trabalho foram avaliados processos alternativos de dessalinização visando a recuperação e reuso da água contida em salmouras concentradas, sendo o processo de cristalização assistida por destilação por membranas (MDC) investigado com profundidade. Foi desenvolvido um modelo diferencial para o processo de destilação por membranas por contato direto (DCMD), contemplando métodos termodinâmicos rigorosos para sistemas aquosos de eletrólitos fortes, bem como mecanismos de transferência de calor e massa e efeitos de polarização de temperatura e concentração característicos deste processo de separação. Com base em simulações realizadas a partir do modelo matemático assim desenvolvido, foram investigados os principais parâmetros que influenciam o projeto de um módulo de membranas para DCMD. O modelo foi posteriormente estendido com equações de balanço de massa e energia adicionais para incluir a operação de cristalização e desta forma representar o processo de MDC. De posse dos resultados das simulações e do modelo estendido, foi desenvolvido um método hierárquico para o projeto de processos de MDC, com o objetivo de conferir características de rastreabilidade e repetibilidade a esta atividade. Ainda a partir do modelo MDC foram discutidos aspectos importantes em MDC como a possibilidade de nucleação e crescimento de cristais sobre a superfície das membranas, bem como o comportamento do processo com sais com diferentes características de solubilidade e largura da zona metaestável. Verificou-se que para sais cuja solubilidade varia muito pouco com a temperatura e que possuem zona metaestável com pequena largura, caso do NaCl, a operação com resfriamento no cristalizador não é viável pois aumenta excessivamente o consumo energético do processo, sendo nesses casos preferível a operação \"isotérmica\" - sem resfriamento no cristalizador - e o convívio com a possibilidade de nucleação no interior do módulo. No extremo oposto, observou-se que para sais com grande variabilidade da solubilidade com a temperatura, um pequeno resfriamento no cristalizador é suficiente para garantir condições de subsaturação no interior do módulo, sem grande ônus energético para o processo. No caso de sais com pequena variabilidade da solubilidade com a temperatura, mas com largura da zona metaestável elevada, existe certo ônus energético para a operação com resfriamento do cristalizador, porém não tão acentuado como no caso de sais com zona metaestável estreita. Foi proposto um fluxograma alternativo para o processo de MDC, onde foi introduzido um circuito de pré-concentração da alimentação antes do circuito de cristalização, para o caso de alimentação com soluções muito diluídas. Este esquema proporcionou um aumento do fluxo permeado global do processo e consequentemente uma redução na área total de membrana requerida. Verificou-se que através do processo com préconcentração da alimentação de 5% até 10% em massa - no caso de dessalinização de uma solução de NaCl - foi possível reduzir-se a área total da membrana em 27,1% e o consumo energético específico do processo em 10,6%, quando comparado ao processo sem pré-concentração. Foram desenvolvidas ferramentas úteis para o projeto de processos de dessalinização por MDC em escala industrial.